Germany
Rover Setup
Coordinate System
Choose a coordinate system based on DHDN (such as DHDN / 3-degree Gaus-Kruger zone 1) or ETRS89 (such as ETRS89 / UTM zone 31N) datums.
Vertical Datum
Choose the DHHN2016 height vertical datum.
The GCG2016 geoid is used to perform the transformation.
Base Setup
Your base or NTRIP service should be in ETRS89. The BETA2007 grid is used to perform the datum conversion.
remarque
The datum conversion from ETRS89 to DHDN uses BETA2007 grid.
When setting up a base station on a benchmark, enter ETRS89 geographic coordinates (lat/long) and ellipsoidal height in the Emlid Flow Base settings.