Israel
Rover Setup
Coordinate System
Choose a coordinate system based on IG05 (such as IG05 / Israeli TM) or IG05/12 (such as IG05/12 / Israeli TM) datums.
Vertical Datum
Choose the ILUM2 height vertical datum.
The ILUM2 geoid is used to perform the transformation.
Base Setup
Your base or NTRIP service should be in IGD05 or IGD05/12, depending on which datum is used. The Helmert (7-parameters) is used to perform the datum conversion.
When setting up a base station on a benchmark, enter IGD05 or IGD05/12 geographic coordinates (lat/long) and ellipsoidal height in the Emlid Flow Base settings.